First Due Mechanic
Stage 1 for the Installation team was fitting the stripe. The offset section is a single print to limit surface seams. The lower stripe crosses the front of the work bed centered on the door hinge, and the upper stripe…
Read MoreVisual Marketing Specialist
Stage 1 for the Installation team was fitting the stripe. The offset section is a single print to limit surface seams. The lower stripe crosses the front of the work bed centered on the door hinge, and the upper stripe…
Read MoreJeff puts a finishing touch on Ace’s Wild new logo graphic. The new logo is part of our design team’s Branding Package – The band now has matching cards, posters, T-shirts, and decals in addition to the trailer graphics. Our…
Read MoreThe Arrowhead Gallery in Old Fort worked with an Artist to develop a new symbol for their logo, and commissioned a large facade sign featuring it on their new gallery and studio space. The installation is over 40 feet in…
Read MoreThe original signage has been removed, and the facade cleaned and ready to receive the new panel. New sign in place! Due to the awning design, the removal and installation required a two-man lift. The building also provides a smaller…
Read MoreWe replaced two double-sided changeable letter signs with branding graphics for KWIK MART and their new CORNER DELI. Here you see Jeff fitting the last retainer, completing the installation. While the CORNER DELI sign is a fully printed piece, the…
Read More